Participate!

Virtual Workshop

Survey

Comment Map

Events

Contact Info

MULTIMODAL TRANSPORTATION

The Okeechobee Blvd & SR 7 Multimodal Corridor Study includes a transit and roadway analysis for the following seven alternatives:

  1. No-build/No-action 

  2. Mixed traffic bus with limited stops 

  3. Business Access and Transit (BAT) curbside lanes 

  4. Center-platform dedicated-lane Bus Rapid Transit (BRT) 

  5. Curbside dedicated-lane BRT 

  6. Center-platform dedicated-lane Light Rail Transit (LRT) 

  7. Elevated grade-separated LRT 

The following technical elements will be performed throughout the study process:

  • Environmental Assessment

  • Evaluation of Conceptual Alternatives

  • Ridership Forecasting

  • Costs Analysis

  • Roadway Analysis and Renderings

  • Prioritization Analysis

  • First/Last Mile Pedestrian and Cyclist Connections

  • Selection of a Recommended Alternative

  • Right-of-Way Impacts of Recommended Alternative

Study findings related to multimodal transportation will be shared on this webpage throughout the study process.

Photo Aug 11, 12 47 35 PM.jpg

COMING SOON!